VPS vs Inter Turku prediction
IT2026-10-24 · FIN · Kickoff 2026-10-24T11:00:00+00:00 (UTC)
What is the VPS vs Inter Turku prediction?
Kickstatix prediction: Inter Turku (A) at 56.3%. The double-chance call is X2 at 80.5%.
This forecast was published 2026-10-23T11:57:07+00:00 before kickoff. Probabilities express uncertainty and are not a guarantee.
Full time: 0–1
1X2 prediction: ✓ Correct
GG and total goals
Market-implied full-match picks. Results use the saved one-hour pre-kickoff quote and require a verified football score.
Unavailable
No eligible pre-match quote saved. No result is scored.
Unavailable
No eligible pre-match quote saved. No result is scored.
2 · 56.3%
LowX2 · 80.5%
LowDouble chance was published at 2026-10-23T11:57:07+00:00, before kickoff.
Market forecast cutoff
Locks one hour before kickoff: .
No eligible frozen forecast. No eligible market quote captured within 20 minutes before the one-hour cutoff. Excluded from market accuracy.
Prediction vs Market
Market sentiment unavailable. No verified market association. Our fixture and published prediction remain available.
Prediction reasoning & independent methods
- The selected source is shin_raw; A has probability 56.3%.
- Methods disagree: largest outcome spread 21%. Confidence reduced to Low.
- Team news is unavailable; High confidence is disabled.
| Method | 1 | X | 2 |
|---|---|---|---|
| Elo ratings | 25.6% | 35.6% | 38.9% |
| Market · margin removed | 19.5% | 24.2% | 56.3% |
| Statistical · hierarchical Poisson | 37.6% | 27.0% | 35.4% |
Pre-match stats, form & head to head
From the original training snapshot through 2026-10-21. Averages use up to ten prior league matches.
VPS
Scored / game: 0.70
Conceded / game: 1.60
Clean sheets: 3 / 10
Inter Turku
Scored / game: 0.90
Conceded / game: 0.60
Clean sheets: 7 / 10
Head to head
2026-09-14 · Inter Turku 1–0 VPS
2026-08-02 · VPS 0–1 Inter Turku
2026-04-04 · Inter Turku 0–0 VPS
2025-08-31 · Inter Turku 2–1 VPS
2025-04-19 · VPS 0–2 Inter Turku
Team news & forecast record
Team news has not been verified.
Training ends: 2026-10-21
Data fingerprint: 52980b68a9074c9a2f4b5204b7048fe6dab581a7d7dcfde314c0a6df6f90f165
Model: existing-source-policy-v1